Operations fit

Rent is fiction. Operations fit is real.

Tell us your power draw, your biggest truck, your storage plan. We'll score every shortlist building on the three details that kill deals after move-in.

<\!-- POWER -->
⚡

Power

Many small-bay buildings supply 200 A at 600 V — enough for light assembly, tight for anything that runs compressors, CNCs, or heavy lighting.

<\!-- TRUCK -->
🚛

Truck compatibility

Older 1980s-era buildings were built for 40' trailers. Push a 53' tandem through and the court jams, the apron grinds, and the door stop lets in snow.

<\!-- ROOF / SLAB -->
▨

Roof & slab load

Want rooftop solar? Cantilever racking 30' high? A 20-ton press? The building doesn't know until you ask. We read the structural reports so you don't have to.

How we score

Three readings, one fit score per building.

Pass

The building meets or exceeds your requirement with no upgrade work. Ready for move-in as-is.

Upgrade

The building can be brought up to spec with a known scope — transformer upgrade, door enlargement, floor overlay — and we estimate the cost.

Hard stop

The deficiency cannot reasonably be cured (structural slab, hydro service ceiling at the pole, court geometry). Move on.

Score every building the AI broker shortlists.

Pro subscribers feed their real operating spec in once. Every shortlist the AI broker returns comes pre-scored on power, trucking, roof, and slab.